Page 11 - ZEB Final Report 2009-2017
P. 11

Research activities in ive work packages have supported these achievements:


                Work Package 1: Advanced Materials and Solutions   Work package 5: Concepts and strategies for zero
                Aim: To develop innovative materials and solutions, to   emission buildings
                improve current state-of-the-art technologies, and to   Aim: To develop precise concepts for zero emission
                exploit synergies between these two endeavours.  buildings to be translated into realised pilot buildings.

                Work package 2: Climate-adapted Low-energy Envelope   ZEB laboratories
                Technologies                                   The ZEB laboratories are important for the testing and
                Aim: To develop climate adapted, verified, and cost   implementation of the centres research activities. Four
                effective solutions for new and existing building envelopes   laboratories are associated with ZEB:
                (roofs, walls, and floors) allowing the least possible heat
                loss and reducing the need for cooling.        •  ZEB Living Lab
                                                               •  The Laboratory for Advanced Materials and
                Work package 3: Energy Supply Systems and Services   Components
                Aim: To develop new solutions for energy supply systems   •  ZEB Test Cell
                and building services systems with optimal energy and   •  The Laboratory for Energy and Indoor environment
                indoor environment performance appropriate for zero
                emission buildings.                            The following section presents research achievements and
                                                               scientific highlights from all five work packages. There is an
                Work package 4: Energy Efficient Use and Operation  overlap between research activities, and we have therefore
                Aims:                                          chosen not to present each work package individually.
                1.  Use and operation: A non-technical evaluation   Collaboration has been important, research is presented
                   of buildings and technical solutions with high   by both scientists and partners associated with the ZEB
                   environmental ambitions, design and construction   Centre. The research is presented by some of the scientists
                   processes, end-use and operation included.  and partners associated with the ZEB Centre throughout
                2.  Implementation: Analysis of zero emission buildings   the eight years.
                   as part of the sustainable transition of the Norwegian
                   construction sector.
   6   7   8   9   10   11   12   13   14   15   16